March 4, 2011

What The Electrician Told Us

One thing DH and I want to do as part of our kitchen remodeling project, is to have the circuit (service) panel moved. I've shown you where the panel is ...

note circuit panel behind the stove

our service panel
... behind the stove. This is both inconvenient, as well as unsightly, not to mention in the way of our remodeling plans. We want to move it into the utility room.

our electric meter
We also want to have our electric meter moved. Ours is not attached to the house like all the other houses in the neighborhood. Ours is out on the nearest telephone pole.

Dan has quite a bit of experience with electrical work, but wasn't sure these were jobs he wanted to tackle. Neither were we sure if local building codes would allow us to do our own work. So he called around to various electricians, and set up two appointments to get estimates.

The first company he called charged for their estimates. "Never mind," Dan said, "I was looking for a free one." A little while later, they called back to say that if they were already in the area, they'd stop by and give us a free estimate. OK, just let us know. A couple days later, we got an early morning phone call, could they stop by that day? In about 45 minutes? Fortunately Dan was home so I said sure.

We learned some interesting things. One was that moving the service panel wouldn't be difficult, though the electric company would need to run longer wires to reach the utility room. We also found out that the wiring to the house from the telephone pole is only 60 amp. No wonder all the lights dimmed every time the heat pump came on! We hadn't been able to figure that out, because the service panel had previously been upgraded to 150 amp, which is adequate for what we use. In addition, he didn't like the way the wiring is attached to the house, and said it needs to be replaced. He also recommended that when we have the meter moved and the wiring replaced, we have the line buried. The electric company would charge a fee, but it could be done.

Then he gave us the estimate. It would be $5552 if we didn't get the service agreement, $5111 if we did. And what did they do for the annual $99 service fee? Oh, come out once a year and tighten any screws and bolts that needed it. ??????

Service agreement aside, it might as well have been 5 million dollars, for what we've got in the bank. So. The very next thing we did was to head out to our local handy dandy home improvement and building supply center and price materials. DH estimated that we could save about 90% by doing it ourselves. And surely, if all the materials were for sale to the public, then we could do the work ourselves (?).

When we got home, Dan called the county building inspector's office and asked if we could do this ourselves. Hem-haw, hem-haw, all around the mulberry bush, blah, blah, hem-haw, blah. But could we do the work ourselves? Um, uh, well, pause, hmmm, uh, well, they'd have to work really closely with us. We took that as a yes.

The second electrician arrived on time for his appointment, with his teenage son in tow because there was no school that day. Ah, here's a dad who is interested in showing his son about his business. That's a good thing, right? He basically confirmed what the first one had told us, but before writing up the estimate, asked if we wanted to do some of the work ourselves. That's good too, right? It indicates someone who's willing to help us make it more affordable, right? He told us he'd email the estimate to us in a few days and then started looking for his son, who was nowhere to be seen. Finally said son came out of our house, where he'd been wandering about by himself looking for a bathroom. Hmm. That made us a little uncomfortable, but considering how his dad chewed him out, we figured it was probably pretty embarrassing for the both of them. For whatever reason, we never heard from this guy again.

The one thing this second electrician did do, was to get the utility company to come out and give us an estimate of what it would cost to replace and bury the line. It would be $500, and of course this is something we couldn't do for ourselves.

So, the wheels are turning. I think Dan may still get a few more estimates from electricians, if for no other reason than to see if $5000+ is as outrageous a price for the work as it sounds. He is definitely going to go talk with the utility company to find out what their requirements are. The plan is now to do at least some of this ourselves. Hopefully we can get started on this phase of the kitchen project soon.

March 2, 2011

My Dynamically Accumulated Mulch Pile

Last fall, I started working on my mulch pile for this coming summer.

Leaf pile last fall.

Last summer, I ran out of mulch and the time to gather it. Buying it is just too expensive, so I ended up having to water more than usual, plus had a real battle with the weeds. I promised myself then, that I'd rake and gather a wheelbarrow load of leaves every day, all winter long. Well, I didn't. It was too wet, too cold, too snowy, too rainy, too windy; I'm full of excuses. Even so, I've made some progress...

Leaf pile now

I like to use tree leaves for mulch because:

  1. they're my zero mile sustainable resource
  2. they're free
  3. their decomposition is how forests get that rich, black, fertile soil. 

One of the things I did on my non mulch gathering days was to read. Of particular interest in regards to mulch, was some information in Edible Forest Gardens, Volume I particularly that on dynamic accumulators. These are plants which accumulate various nutrients through their root systems, and store them in their leaves, stems, etc. The nutrients are released back to the soil when the leaves drop or the plant dies. Obviously having these plants around would be useful for both garden and compost.

We have some huge oaks in the yard, so I gather a lot of oak leaves for mulch. These have a down side though, in that they acidify the soil. This means I need to keep an eye on the soil pH, and adjust if necessary. Of particular interest to me then, was the table on page 64, "Selected calcium accumulators and their accumulated nutrients." Most of us have soil with calcium deficiencies, as evidenced by blossom end rot on our tomatoes and peppers. I've always used a calcium spray to correct the problem, but the solution would be to build up soil calcium.

The table only listed about ten calcium accumulators, but I was pleased that several of the trees in my yard were on that list. Pecans and hickories accumulate not only calcium, but also potassium. Shagbark hickory and flowering dogwoods accumulate calcium, potassium, and phosphorus. I have all these trees! I started to make it a priority to rake and pile these leaves first.

Other plants on the list are plantains, which are plentiful here. Pulling and tossing these into the compost pile would be another way to contribute to my soil calcium. Also chives, chamomile, chicory, and horsetail, all of which I plan to grow.

Volume 2 of Edible Forest Gardens has extensive tables in the appendices, which list the multiple functions of various plants for polycultures, including dynamic accumulators. Unfortunately, that volume has mysteriously disappeared from our county library. :(

I wish I could say that my entire mulch pile is composed of leaves from dynamic accumulators, but there are still a lot of oak leaves in there. Still, at least I now know which trees to rake under first.