February 15, 2026

New Look For the Masonry Stove

I have one more project update to share with you, this one is for the masonry stove. After we made the adjustments and improvements on it last summer, I wasn't sure that I liked the resulting look of it.
 

The improvements in efficiency were well worth the change in aesthetics, but I was used to the visual variations of the bricks and wasn't sure I liked the solid white. I felt something was needed. Here's what we ended up doing.


The newly painted green alcove matches the thermal curtains I bought last year. I got the cast iron tree silhouettes from Etsy. All in all, I like it better. I liked the brick look best, but this is a good alternative.

January 12, 2026

Front Room Remodel: Back of the Masonry Stove

To the left of the closet, a coal burning fireplace once stood.

Front bedroom fireplace when we moved in, May 2009.

It stood back-to-back with the living room fireplace. We tore them both out when we built the woodstove alcove for our soapstone woodstove.
 
The brick wall is the back of the woodstove alcove.

When we built the masonry stove, the back of the alcove became part of the heater's thermal mass.

The back of the masonry stove with the wall torn out.

But how were we going to finish that wall? For months, that was the subject of much brainstorming. As part of the stove's thermal mass, the bricks radiate a lot of lovely heat, so we wanted to leave that part exposed. The biggest question was what to do about the arch. Treat it as a design feature? But how? We wanted to use something noncombustible, which added to the challenge. Dan used cement board above the bricks for the alcove, but he wasn't sure he wanted to do the same on this side. What were our other options?

Without going through our boring drawn-out thought process, I'll jump right to the finale and then follow up with a few details. 

Here it is now. The corrugated metal panel adds to the room's barn
motif yet isn't an insulator; it doesn't impede heat from the stove.


One of the design details I mentioned above was that we didn't want to block the heat on the sides of the stove. 

The principle of a masonry stove is that heat is produced in the firebox and held in an empty brick box (the thermal mass) which radiates warmth for at least half a day (and stays warm to touch for much longer). With a standard cast iron stove or fireplace, on the other hand, most of the heat goes up and out the chimney, and the room starts to cool off as soon as the fire goes out.

The exposed front and back of the stove do a fine job of radiating that warmth. On the sides, however, we have walls. In keeping with building code, there is an air space between the stove and the existing brick alcove wall, and there is another air space between the brick wall and room wall. Further, the room walls have a layer of heat-rated insulation. The challenge was to allow the warm air in those spaces to escape into the room rather than getting boxed in. 

The mantle post pretty much hides the gap, but doesn't fit snuggly against the bricks.

The other part of the challenge was that the bricks are uneven in the stove corners, because we never dreamed the back of the alcove would ever be exposed. Our solution was to cover the opening between the brick and the mantle post with screen, to allow the warmth to circulate out into the room

The screen is curved to make a column-like look.

Except I didn't like seeing the brick through the screen. So I painted the bricks black.

After painting the bricks.

I'm much happier with that. 

Here's a closeup of my decorative mantle bit.

Two of the wind chimes I made myself.

The one on the left is made from pirns. Pirns are what they call the bobbins for end-feed weaving shuttles. I don't use that kind of shuttle, so I thought this was a better use of them than storing them in a drawer. The one on the right is made with bells I originally bought for the goats' collars. Except the product description led me to believe they were bronze, which they aren't, these are just cheap metal with a bronze color coating. They've been sitting in a drawer too, and were perfect for an indoor wind chime.

Another section of the front room is done! Next I'll show you how Dan finished the front window wall. 

October 13, 2025

2nd Test Fire & Masonry Stove Improvement #4


The Structo-lite plastering (stuccoing?) is complete and I don't mind telling you I don't know what to think. I really really liked the bricks, but with the small and annoying smoke leaks in the mortar, this was the option Dan went with. The second test fire confirmed it was a good choice because thanks to better sealing of the thermal mass, the smoke by-pass, and improvement #4, the stove worked beautifully!

Improvement #4 was to enlarge the built-in damper in the firebox door. It just wasn't large enough for a good air flow to get the fire started. 

Our firebox door. Photo from Masonry Heater Project

The slots on the bottom are the damper, with the cute knob to adjust the air intake. For our particular type of stove, this air intake needs an area of 2 & 3/8 square inches. The original door damper was less than 2 square inches and so the fire had trouble catching. Dan enlarged the air slots to the required specs and that made a big difference. 

The photo's a little dark but hopefully you can see the difference.

For our 2nd test fire, better initial air flow made it easier to get the fire going. 

My challenge now is the aesthetics of the thing. The plaster is off-white, which looks brighter compared to my pale gold walls. Off-white is a nice neutral color, but in my mind it needs to coordinate with it's color environment to its best advantage. I'm seriously re-thinking my living room color scheme! That's one thing I'm contemplating. The other is the solidness of the color. The subtle color variations in the brick gave the stove visual texture which is gone now. So that's the other thing I'm thinking about. The thing is, aesthetics is highly subjective. So there is no right or wrong, it's just a matter of what one likes.

The most important thing is that the problems we had have now been addressed and the stove is functioning as it should. It burns more efficiently with very little ash left in the firebox afterward, and the thermal mass retains and radiates the heat beautifully.

While I decide how to address the visuals in the living room, Dan is in the planning stage for finishing the back of the stove and rebuilding the closet in the front bedroom.

Finishing the wall and remodeling the closet will be two separate projects.

We have our indoor winter projects cut out for us.

September 20, 2025

Test Fire for the Smoke By-pass & Stove Improvement #3

We had a test fire the other day to see if our smoke by-pass worked. Success! It's going to take some figuring out in terms of judging when the thermal mass is heated enough to close it, but that will have to wait. It's still too warm outside to heat the house more than it already is. But by opening and closing the damper we could make some assessments.

One of those assessments were a few smoke leaks in the mortar between the bricks. We noted these last year but waited to figure out what to do. One option was to repoint the brickwork, which involves touching up the mortar between all of the bricks. Dan wasn't too keen on this. The other option was to plaster the entire stove. This would deal with any small leaks and also give the stove an entirely different look.

We considered covering the brickwork with mortar last year, but I liked the look of the brick so we left it. Experience has an amazing way of changing one's mind, however. 

Here's the stuff Dan is using.

Structo-Lite. Dan found it at Ace Hardware for about $26 for 50#.

Structo-Lite contains gypsum plaster and perlite, has good insulation value, and is suitable for high heat applications. 


It dries to an off-white. Coloring is available to mix in, but I thought off-white was a nice neutral color that will go well with any color scheme. 

To get a cleaner edge on the corners, Dan found this trick on youtube.


His brickwork wasn't as even on the corners as he'd like, so the mesh pretty much evens them more consistently for plastering. 

So that's what's up at the moment. Two coats are recommended, and then we can have a second test fire. 

September 13, 2025

Masonry Stove Improvements: Clean-Out Door

I'll start this post by saying we've just been plugging away here. I'm still busy with the garden and cheese making. Dan has been busy on the stove. After installing the smoke by-pass, his next step was to put in a clean-out door. So at last I have something to show you.  

The clean-out door is a necessity for removing any ash or residue inside the stove. Last year when we designed the layout, we decided to put the clean-out in the back of the stove, which is part of the wall in the front bedroom. 

Originally, the house had double back-to-back fireplaces. This is where it was in the front
 bedroom (now my big loom room). Photos of the original bedroom and fireplace here.

Dan tore the entire bedroom wall out last summer. We wanted to remove the combustible tongue-and-groove wall and also remodel the closet.


To get a good look inside the stove, Dan cut a nice size hole in the bricks. 

What you see inside the stove is the core (firebox). 

Based on efficiency, we had a feeling one of the bricks had fallen off the and sure enough, it had. Dan had enough room to repair the brick and vacuum out the thermal mass. 

Most clean-out doors measure about 8-inches by 8-inches. I suppose that's adequate for sweeping out ash, but for our stove design, we were glad to find one measuring 12-inches by 12-inches. Plenty good for inspecting the inside and using the shop vac to clean it out. 

Door frame in place

Door done. 

We found it on Amazon, the link is here.

So that's done! Dan has one more improvement he wants to make, so more on that sometime. First fire is usually mid-October, so we'll be ready. 

September 4, 2025

Masonry Stove Improvements: Smoke By-pass

Last summer, Dan built a masonry stove to replace our cast iron wood heater.

Masonry stoves are based on ancient
technology
and are amazingly efficient.

The gist of how it works is that the firebox is located in a large, empty space called a thermal mass. The thermal mass retains and radiates heat long after the fire goes out. 

Last winter, we used it and loved how long it kept the house warm between fires. The downside is that it tends to be a bit smokey with a cold start. Until the mass warms up enough to create a good draft, smoke comes out every time the door is opened, or through any leaks in the masonry. There are tricks for dealing with this (Tests and Tweaks), and usually, people only have trouble at the beginning of the season. For us, however, in our goofy southern climate, there are times when we don't need the stove and let it go out. In a typical winter here, we might restart the stove several times, especially in spring. 

Last month, Dan added a smoke by-pass to use when the stove is started up. The by-pass offers a direct outlet for the smoke created when starting a fire. Once the stove heats up and the draft is good, the by-pass damper is closed and the thermal mass can build up heat. 

Here's what Dan did in pictures.

The first step was to take down the existing chimney pipe. He
cleans the chimney once a year anyway, so that got done too.

Installing the damper required drilling a 6-inch hole in the top of the
 stove. For that, we had to get a 6-inch diamond masonry drill bit.



The damper had to be modified to be a by-pass. This is because a typical damper plate has openings in it. We needed to seal these so that there would be no heat leaks when the damper was closed. To block the openings, Dan added a disc of ceramic fiber blanket. 

Here it is from the damper side, where you can see the openings
and gap. You can also see how the insulation discs blocks them.

Insulation side


To close off the damper when not in use, the disc of ceramic blanket had to be cut larger than the damper plate. But Dan was concerned that the soft, pliable fabric wouldn't stay flat. He thought about it for awhile, and then settled on holding it in place with a round table saw blade.

 
Here it is, reassembled with the new smoke by-pass in place.



It's still too warm to try it out, but Dan has a couple more improvements to work on, so I'll show you those as he finishes them. 

November 22, 2024

Masonry Stove: Tests and Tweaks

After stove construction was complete, it was time for a breaking-in fire to test for leaks. And this is where the adventure began. We knew from Permies (my go-to place for information and questions), that first fires in these stoves are smokey and full of surprises, so we picked a mild afternoon where we could open windows and doors if need be. 

Dan got the fire started and long story short, the room was so smokey we had to run out onto the front porch! It wasn't bad enough that there were billows of smoke rolling out of the open doors and windows, but bad enough to crank up all our fans to start to exhaust it. 

Since the experienced stove builders on Permies all knew about this, their advice was to keep the fire going. This is because part of the problem is that the stove is cold, and the chimney is cold, so there's no draft yet to pull the smoke out of the chimney. I learned this has to do with positive and negative pressure. As the bricks heat up negative pressure is created which assists in getting the draft going. This is a typical problem at the beginning of stove season and why people sometimes heat the chimney before starting the fire.

The second reason is that the bricks and mortar aren't completely cured yet. Not sure how that works, but we did notice that the back wall of the thermal mass (bell), the wall that was originally part of our woodstove alcove, didn't leak at all.

Lastly, there are often tiny spaces and cracks in the mortar that allow smoke to leak. If the stove is properly built, these leaks stop as soon as the draft gets going. The biggest culprit for us was around the doors, which needed more mortar for a better seal. We also took note of a number of seams that could be pointed with mortar to seal them. 

Once we got a good draft going, all the smoke leaks disappeared, which meant that the stove was functioning properly. We kept a low fire going for the rest of the day and the bell gradually heated up. We were pleasantly surprised that even a small fire heated the bell and heated the house. We would often keep small fires in our soapstone stove on cold days to preserve some coals, but we never got any heat out of that and the house was cold when we built up the fire again for the evening. So, already, we were getting more out of our wood!

The other bonus was that by the next morning, long after the fire had gone out, the brickwork is still very warm and the house was cooler but still comfortable. 

After the stove cooled, Dan set about to seal the doors and obvious cracks. I have to admit we were both a little nervous about that second fire. However, I heeded the advice on Permies to preheat the chimney and used one of our space heaters to warm the chimney first. I wanted a good draft from the git-go! 

Space heater to heat the cold chimney. Heating the
chimney is only needed when the stove is cold.

This worked beautifully and between that and Dan's pointing the mortar, our second stove fire was smoke free! No more smoke leaks and even the roof chimney exhaust was clean.

What a relief.

We're still in the breaking-in stage, and still learning about masonry stove and fire management. With a conventional wood stove, a fire must be kept going as long as  heat is wanted. With a masonry stove, only two fires per day are typically needed. Since the stove is already warm there are no more draft problems for the season.

I've been monitoring the temperature near the chimney flue . . .


Remember, the heat is retained in the bell so that the coolest air exits out the chimney.

100 F (38 C) at base of chimney

When the stove is heated, the bricks are very warm to touch. I can put my hand on them but they're too hot to leave my hand there. 


So, except for cleaning up the bricks a bit after the mortaring, a big project is complete. We're already getting more heat out of less wood, so it's fulfilling what it's promised. Very happy about that!

November 18, 2024

Masonry Stove: Chimney

Well, this took longer than we thought it would.


But at last, the chimney is installed. The holdup was getting the chimney pipe pieces. Used to be that everything was available locally, from a choice of sellers. Everyone has gone to stocking less and directing customers to order online and have it shipped to the store for pickup.

To be fair, I understand this trend. I understand the decision not to stock less common items in the store. But the problem for the buyer is that hands on information is extremely important. Sometimes its a matter of judging the quality. Or fit. Is it the right size? The website information isn't always accurate on this. Often it's just an approximate size, or worse, some sellers don't know the difference between height, width, and depth. Sometimes the item sent doesn't look anything like the picture. Or it'd flawed or damaged. Yes, they say free returns, but there's another trip we have to take and more time lost.

Another holdup is that shipping is not as fast as it used to be, so it took awhile. The two long pieces od chimney pipe were ordered at the same time but arrived on different days! For awhile we were thinking one of them had gotten lost. Thankfully, everything arrived and everything fit. 

If you haven't been following this series, then you may be wondering why the chimney exits from the bottom of the stove. I'll refer you back to my introductory post, with more detail about how a masonry stove works. The gist of it is that the firebox is contained in a large hollow masonry "bell." The bell warms up and retains the heat, which radiates into the room, keeping it warm for most of the day. To better retain that heat, the chimney flue is at the bottom of the bell, so that the coolest air exits the chimney and keeps heat loss to a minimum. Very different from the common wood stove or fireplace. 


So there it is, curing and ready for a breaking in fire. We've got a cold front heading our way, so that should be soon. 

November 4, 2024

Masonry Stove: A Bake Oven

We left off last time with this photo  . . .

From Masonry Stove: A Wee Bit More Progress

The final stretch of the brickwork was to create an oven. The arched roof is reminiscent of pizza ovens, and it just seemed that an oven was the perfect thing for that space. The first step was an oven floor. Dan started by using his grinder to make slots to hold three pieces of angle iron.

The front and middle irons inserted into the slot. One more will go behind.

The three pieces of angle iron hold two rows of firebricks. 


For a drip pan to protect the bricks from spillage (just in case!), I purchased an oven bottom liner replacement.


I would have preferred a larger one, but this was the closest in size I could find. I don't know if I'll bake many drippy dishes in the oven (like pies or pizza) but this will certainly be easier to clean than the brick if I have to. 

Then Dan continued with the bricks until the placement of the oven door. 



For the oven rack, I bought a 3-piece cast iron replacement grate for gas grills. 

The grates fit perfectly and are removable for cleaning.

For the picture below, I removed one of the grates so you can see how he got them level with the bottom of the door opening.


We discovered that the height of a firebrick on its side was perfect. Two more pieces of angle iron (in this case, they are actually iron bed rails) are wedged between the brick walls and hold the grates in place. It's a good height for the grate, with plenty of space underneath for hot air circulation.

Next was installing the oven door. Like our firebox door, we got it from Firespeaking. And like the firebox door frame, Dan screwed a steel sleeve over the top of the frame.


This was because there was just a couple of inches gap between the top of the frame and the brick arch. The steel sleeve supports the slivers of brick and mortar needed to close and seal that gap.

With the oven door frame in place.

What I didn't get a picture of was the strips of insulation tucked in around the frame. That was included with the kit. 

Door complete.


The opening is 15 & 5/8 inches, which is wide enough to accommodate my pizza stone. Whether or not I will ever bake a pizza in it remains to be seen. This is because of how the stove is operated. Unlike cast iron stoves, which often keep a fire all day, a masonry stove uses only two fires a day. The fire heats the bell (hollow brick structure), which radiates heat over a period of time. So I won't have fine-tuned temperature control in the oven. I'm going to have to put an oven thermometer in it and monitor the heat until I can identify patterns and when it's at baking temperatures. 

The last thing to do will be to install the stovepipe for the chimney. Then we can have a breaking-in fire.