April 5, 2022

Pasture Swale Prep: Moving That Pile of Dirt

The biggest project on our spring project list is getting a start on our pasture swales. Our garden swale is functioning beautifully, so the next step is to extend our swale system to the pastures. We want to start the next swale near the one in the garden, to take advantage of its overflow. However, we had an obstacle; a big pile of fill dirt that Dan made when he dug out the old buried swimming pool. I finally have some progress to report.

Photo from "Our Agrarian Year: Spring Project List."

Disappearing the pile was done in stages. March was rainy, but in between rains it was warm enough to dry things out. Between the tractor and scrape blade and some hand digging, we redistributed the pile over several weeks.

Dan started by spreading out as much as the scrap blade could reach.

Then we had to knock the top of the pile down by hand.

More spreading until he got to the fence.

This last bit at the fenceline was moved by hand as well.

Then he secured the fence once again, to keep the goats from escaping.

Looking at it from the pool side, a view that has been
blocked by that huge pile of dirt for over two years!

The soil was fill dirt: a mixture of sand, clay, silt, rocks, and mica flakes. I don't expect much in terms of fertility, but spreading it out on the pasture was the fastest and easiest option. It's a relief to have it done.

Next, we'll measure and mark a level line to dig the swale. Then, I'll broadcast pasture forage seed over the soil and cover it with old barn bedding. The old straw and manure will be protect the seed and feed the soil. All weather permitting, of course!

April 1, 2022

House Project: Finishing the Exterior

We had a lot of rain in March, and it was often too wet for digging swales or spring planting. So Dan chose another project from the to-do list - finishing the exterior of the house. It wasn't a huge project because this is all we have left -

The last exterior wall to do, with the original c.1920 windows and shiplap wood siding.

So, while waiting for the ground to dry out, that's what Dan has been doing. 

We started upgrading the siding back in 2011, when we replaced the kitchen windows. We've gradually worked our way around the house, replacing the original single-glazed windows with energy efficient ones and tweaking the wall insulation if possible. Then new siding and trim go up, and we paint. 

Considering how many years this task has taken, we wondered if we could still get our original barnboard siding. And if we could, what would it cost! The sheets we bought in 2011 were $20 each. When Dan went to Lowes to see what was available, the original pattern was no more. But he was able to find a pretty close match, except the cost now is $45 per sheet and the sheets are thinner. We're glad we saved the wall with the least square footage until last.

Dan also wanted to replace the gable vents, but didn't like the price or quality of the ones for sale. So he made his own.



Lastly, the trim got a fresh coat of paint.

The exterior of the house is finally done! It feels like a milestone. There are still two more rooms to finish on the interior, but that probably won't be for awhile. The next house project we want to tackle, is putting up the two extra solar panels we didn't use for the fridge and freezer. But even that must wait when the ground is workable. "Food first," so planting must be the priority.

March 28, 2022

March Photos

Closing out March with a few random photos from my March photo folder.








I have to comment on the above photo. I've put a lot of "cat in front of the wood stove" photos on my blog over the years, and about 99% of them have been with Sam in the kitty bed. One day, Meowy helped herself to the kitty bed, and big scaredy-cat Sam is too intimidated by feisty little Meowy to take it back! So, he's found himself a new spot to sleep. 


All remains well in Sam's world.

March Photos © March 2022 by Leigh